
Ebco Bed & Wardrobe Fittings & Accessories Bed Fittings > WALL BED FITTINGS Wall Bed - Single (Complete Fittings with Frame, Slats and Manual Legs)
EBCOAtBed Frame Size : 2000 X 900mm Overall Size Of Bed With Carcass: 1010mm (W) X 2085mm (H) Considering 25mm Panels Recommended Bed Internal Size : 960mm (W) X 2035mm(h) Dead Load Range 55 60 Kgs
₹13,033.6/unit₹18,40929% off
Only one option



















